Think of the way walls get put up: a prefabricated wall before the invention of the crane and the pulley has to be pushed up by a bunch of people. 想想筑墙的方法:,在发明起重机之前,一面提前造好的的墙,由人力推起。
At present, the rigid-body limit equilibrium method adopted in the design of crane beam on rock wall can not reflect the actual mechanical behavior of crane. 目前,岩壁吊车梁设计所采用的刚体极限平衡设计方法还不能确切反映岩锚吊车梁的实际受力状态。
Disk wall liner hanger cantilever walking crane 盘形井壁衬管悬挂器壁装移动式悬臂起重机
Wall crane is fixed to the wall cantilever crane, or may be along the wall or other support structure on the elevated track running cantilever crane. 壁上起重机是固定在墙壁上的悬臂起重机,或者可沿墙上或其他支承结构上的高架轨道运行的悬臂起重机。
If the wall units are too large for one crane they are sometimes lifted by two cranes working together. 如果墙体构件太大,一台吊车吊不起来,有时就用两台吊车合力吊起。
In the process of overturning stability analysis of counterforted buttressed quay wall with crane rail bearer, we shall consider the stabilization moment caused by the force of cutting pile. 设置桩支承的起重机轨道梁的扶壁码头结构形式,抗倾稳定性影响分析中应该考虑截桩力的稳定力矩。
Research and Development on Electric-Hydraulic Safety Limit Control System Based on Virtual Wall Technology for Mobile Crane 起重机基于虚拟墙的电液安全限位控制系统的开发研究
The hefty wall panels are then lowered into place by a crane. 笨重的枪板可以使用吊车放入特定的位置。
Stress calculation and finite element analysis of cat head like masthead of diaphragm wall grab crane 连续墙抓斗起重机猫头架结构应力计算与有限元分析
The excavation of foundation for rock wall crane beam is the key of whole construction. 岩壁吊车梁壁座的开挖成型是整个岩壁梁施工的关键。
Summary of the design of rock wall crane beam in underground power house of the Baise WR pivotal project 百色水利枢纽地下厂房岩壁吊车梁设计综述
Excavation of Foundation for Rock Wall Crane Beam in the Underground Powerhouse of Tai'an Pumping-storage Station 泰安电站地下厂房岩壁吊车梁壁座的开挖施工
Construction Effects of Large and Deep Foundation Pit Support with Soil-Nailed Wall and Related Tower Crane Installation 大型深基坑以土钉墙作围护的施工效果及基坑内塔吊安装
Based on analyzing the wall thickness design and stability checking method of drum, the finite element analysis of the crane 'drum is studied. 在分析传统卷筒壁厚设计与稳定性校核方法的基础上,对起重机卷筒进行了有限元分析。
Design of wall attaching structure for tower crane 塔式起重机附墙结构设计